国产激情在线五码|久久鲁丝无码成人片|一级日韩毛片AA级大全S|国内成人女性一区二区自拍视频|手机在线看无码视频|国产色拍视频午夜成人销魂|在线视频干中文久久草|a级黄色在线网址|国产乱偷精品视频在线视频观看|操逼视频免费观看无码日韩

客服熱線:
環(huán)球工程機(jī)械網(wǎng)
環(huán)球工程機(jī)械
商家二維碼
手機(jī)查看商家
明星產(chǎn)品
010-57486488
首頁>工程承包>工程承包>英國ALUFER礦業(yè)在幾內(nèi)亞的鋁土礦項目動工
公司簡介

歡迎您來電來函,期望與您攜手并進(jìn),供求雙贏! 查看更多 >

項目介紹

招商項目:英國ALUFER礦業(yè)在幾內(nèi)亞的鋁土礦項目動工

  • 投資額度
  • 發(fā)展分銷
  • 需交保證金
  • 店鋪面積要求
  • 網(wǎng)店類型
  • 工程承包區(qū)域:全國
  • 發(fā)布日期:2017-09-12 08:40
  • 有效期至:長期有效
  • 瀏覽次數(shù)0
 
英國ALUFER礦業(yè)在幾內(nèi)亞的鋁土礦項目動工


2月3日,英國ALUFER Mining Ltd礦業(yè)公司在幾內(nèi)亞博法省的鋁土礦項目舉行了基礎(chǔ)設(shè)施建設(shè)開工儀式,幾內(nèi)亞總統(tǒng)孔戴出席了開工儀式。

此外,幾內(nèi)亞地礦部長馬加蘇巴、英國駐幾大使Cathérine Inglehearn女士等貴賓也出席了開工儀式。


英國ALUFER礦業(yè)公司在幾內(nèi)亞注冊成立的幾內(nèi)亞法人企業(yè)名稱為:Bel-Air Mining。該公司在幾內(nèi)亞的礦區(qū)位于:博凱大區(qū)(Région de Boké)博法?。≒réfecture de Boffa)杜布如縣(la sous-préfecture de Doupourou)境內(nèi)。


新聞背景:


英國ALUFER公司BOFFA鋁礬土礦項目

  (一)項目基本背景

ALUFER公司是一家在英國注冊的礦業(yè)企業(yè),ALUFER在幾內(nèi)亞注冊的當(dāng)?shù)胤ㄈ斯久Q為Bel Air Mining,該公司在幾內(nèi)亞東北部的博法?。˙OFFA)獲得一處鋁礬土礦。

英國ALUFER公司在幾內(nèi)亞的礦區(qū)位于:博凱大區(qū)(Région de Boké)博法省(Préfecture de Boffa)杜布如縣(la sous-préfecture de Doupourou)境內(nèi)。

距離大西洋出???5公里,已探明鋁礬土礦儲量1.46億噸。

2016年2月1日,英國ALUFER公司與幾內(nèi)亞地礦部簽署《采礦權(quán)基礎(chǔ)協(xié)議》。協(xié)議的核心條款有:

1、幾內(nèi)亞政府在該項目中占15%干股(不出資),英國ALUFER公司以注資和投資占股85%。

2、在項目啟動的前5年,該項目享受一系列的稅收減免優(yōu)惠待遇,例如,免交最低包干稅、免交公司盈利稅、免交土地稅、免交采礦權(quán)證稅、免交資源稅等。

3、ALUFER公司承諾在整個開采期內(nèi)投資不低于5億美元;其中,第一期啟動階段基礎(chǔ)設(shè)施投資1.85億美元,直接和間接創(chuàng)造當(dāng)?shù)鼐蜆I(yè)3000人以上。

4、幾方承諾,不對該項目采取國家征用、沒收、國有化、本土化等措施。

2016年6月3日,幾內(nèi)亞地礦部向幾內(nèi)亞國民議會提交了幾內(nèi)亞政府與英國ALUFER公司簽署的鋁礬土礦開采權(quán)協(xié)議文本,地礦部長向國民議會做了有關(guān)說明。經(jīng)過審議,幾內(nèi)亞國民議會批準(zhǔn)了該協(xié)議。至此,該項目采礦權(quán)協(xié)議完成了幾內(nèi)亞《礦業(yè)法》規(guī)定的批準(zhǔn)程序。


  (二)基建計劃

ALUFER公司計劃在大西洋出??谕顿Y建設(shè)一個深水碼頭,能容納10萬噸散裝船???。修建礦區(qū)到碼頭的15公里長的瀝青公路,計劃使用礦山運(yùn)輸重型開車將礦石運(yùn)輸?shù)酱a頭,裝船、出口。

第一期基建計劃2017年初動工、2018年底完成,第二期基建工程計劃2019年初動工,2021年完成。

2018-2023年,計劃年出口鋁礬土礦500萬噸,2023年以后提高到1000萬噸。出于環(huán)??紤],ALUFER開采方式不采用傳統(tǒng)的炸藥方式,而采取直接使用大型專用挖掘機(jī)挖掘。

據(jù)幾內(nèi)亞地礦部官網(wǎng)報道,2017年1月13日,幾內(nèi)亞地礦部長馬加蘇巴與英國ALUFER礦業(yè)公司高管舉行工作會談,就英國ALUFER公司在幾內(nèi)亞博法省(BOFFA)礦區(qū)項目啟動基礎(chǔ)設(shè)施建設(shè)交換意見。

英國ALUFER公司在幾內(nèi)亞注冊成立的幾內(nèi)亞法人企業(yè)名為Bel Air Mining SA,根據(jù)其計劃,該公司將投資1.85億美元,修建礦區(qū)營地、辦公區(qū)、一條15公里的道路、港口裝船設(shè)施、各類機(jī)械設(shè)備等。



英國ALUFER礦業(yè)公司在幾內(nèi)亞注冊成立時間:2010年4月29日

 

聯(lián)系方式:

Résidence Marine

Cité Ministéreille

Commune de Dixinn

BP 4874

Conakry

電話: 00224-628 683 801

 

 



駐幾內(nèi)亞使館經(jīng)商處

2017年2月5日


Mines : Alpha Condé lance les travaux du projet Alufer Mining à Boffa pour 200 millions USD

Le président Alpha Condé, était l’h?te de marque des populations de Doupourou (préfecture de Boffa) où il a procédé ce vendredi 3 février au lancement des travaux du projet Bel-Air mining du groupe ALUFER pour un investissement de plus de 200 millions dedollars américains. Tel est le constat fait par Guinéenews sur place.

C’est vers 11 heures du matin que l’hélicoptère présidentiel a atterri à la place publique de l’h?tel Bel-Air situé dans la sous-préfecture de Doupourou, préfecture de Boffa. Après la revue des troupes et des autorités locales, le président Condé a eu un bain de foule dans un accueil chaleureux des populations massivement mobilisées pour la circonstance.

Alufer Dans son discours de bienvenu préfet de Boffa, Hadja Aicha Sakho, a indiqué que c’est la première fois que cette préfecture bénéficie d’un projet d'une telle envergure qui va enfin lui permettre d’amorcer son essor économique. ? Le projet que Boffa accueille a, dans toute sa phase préparatoire, donné une place de choix à l’information et à la communication entre le projet, les autorités locales et les communautés ?, a fait remarquer le préfet de Boffa.

? Avec notre associé, nous nous effor?ons de construire à Bel-Air, une mine du 21eme siècle pour une population de 21eme siècle. Plusieurs centaines d’emplois seront créés et des centaines de millions de dollars, comme taxes et redevances seront payées à l’Etat ?, dira Adonis Pouroulis, président du conseil d’administration d’ALUFER.

Poursuivant, il a précisé que ? pour cet investissement important, le travail acharné de tous et le soutien du gouvernement de la Guinée ont permis au projet Bel-Air de franchir une autre étape importante. ?

Cathérine Inglehearn l’ambassadeur du Royaume Uni et le premier conseiller de l’ambassade des Etats-Unis d’Amérique sont tous heureux d’être associés au financement de ce projet. Dans leur intervention, ils ont tous exprimé leur satisfaction et leur volonté

d’accompagner ce projet.

Le ministre des mines pour sa part, apprécie hautement ce projet et s’en réjouit. ? Nous partageons la satisfaction d’Alufer devant le

succès de sa démarche de financement. Le développement de nos ressources naturelles pour les marchés internationaux est très important pour l’économie guinéenne ?, a affirmé Abdoulaye Magassouba.

Dans son discours de circonstance, Alpha Condé a fait un large commentaire sur sa vision du développement du secteur minier en Guinée avant d’inviter les autres partenaires à emboiter les pas au projet ALUFER. Il a émis le souhait de voir la Guinée devenir le premier pays producteur mondial de bauxite. Mais par ailleurs, dit-il, sa priorité reste et demeure le développement du secteur de l’agriculture pour une Guinée émergente. ? C’est bon de développer les mines mais nous allons privilégier l’agriculture. Cela permettra à la Guinée d’être un pays émergeant ?, a rappelé le président Condé.



Alufer Mining Limited (“Alufer” or the “Company”) is an independent mineral exploration and development company with significant bauxite interests in the Republic of Guinea.

The Company is currently focused on the development of the Bel Air project, with production expected to commence in 2018.

Significant capital has been invested in exploration since January 2011 and substantial work programmes have identified a JORC compliant resource in excess of 3 billion tonnes of high quality bauxite at Bel Air and Labé.

Alufer places a great deal of importance on sustainability and is committed to ensure that it operates in line with the highest social and environmental standards.

The Company’s Board and management team have an in-depth knowledge of Guinea and the bauxite markets and have extensive experience in managing and operating exploration, development and production stage mining assets.Project has low capital requirement and operating costs due to proximity to coast and DSO production

Short construction timeframe of 18 months


Over 146Mt of JORC compliant resource has been identified – 46% Total Al2O3, 40.5% Av. Al2O3 and 1.7% RxSiO2

Development plan is for a 5.5Mtpa initial production rate, ramping up to a 10Mtpa open-pit operation, trucking DSO ore to coast for loading via transshipping barges to Capesize vessels

Fully licenced and formally documented: Mining Convention, ‘Project of National Interest’, DFS, ESIA (IFC and Equator Principles)

The Mining Convention was signed with the Government of Guinea on the 1st February 2016 (to view press release please click here) and subsequently ratified by Parliament in June with the Presidential Decree received in July 2016. Agreeing the Convention was a significant step forward, setting out the operational regime and fiscal/tax incentives for the development of the Project


Extensive DFS completed – validating logistics, construction and mining plans, as well as economic model

Comprehensive Social and Environmental Impact Assessment Studies are ongoing to strive to ensure full IFC and Performance Standard compliance


Next steps – complete financing package and secure offtake

Work on the financing package is well advanced with commitments from a number of strategic investors and institutions

Discussions with parties regarding potential offtake agreements underway

Bel Air production scheduled to commence in 2018

Alufer recently completed an extensive DFS which has validated the logistics, construction and mining plans as well as the economic model. This has also served to finetune the parameters, streamline efficiencies over the longer term and improve construction readiness.


Production will commence at a rate of 5.5mpta, ramping up to a 10.0mtpa operation.


The following plans have been /confirm/ied:

Surface mining will be used as the mining method as this is a low opex option with simple handling and high efficiency

Optimised mining control

Significantly reduces strip ratio, waste handling and haulage costs

Lower fuel consumption

No crushing required

Improved in pit ground conditions

Reduced bulking factor

Reduced double handling

Less dust creation

Materials handling will ensure control of dedicated logistics and facilities

ROM ore will be delivered to the bin using side tipping trucks

This will be withdrawn using two apron feeders and conveyed from the bin to the stockpile

This will be reclaimed by apron feeders and conveyed along jetty to barge loader

SCADA control included

onshore infrastructure will include:

A self-contained camp and operations centre

Water wellfields which have been identified and designed

Power obtained by diesel generators

Dedicated communications and internet

Barge loading will comprise one slewing, telescopic barge loader

This represents the optimum balance between low capex, simplicity of operation and functionality

Achieves nameplate capacity of 2,000tph (continuous)

Barging will transport the ore to an Ocean Going Vessel at the Transshipment Zone, approx. 32km offshore

Transshipment involves the loading of bauxite into barges at a barge berth at the end of a causeway and then onto Capesize vessels

Tenders are currently being developed on these key construction packages:

Mining

Haul road development

Materials handling

Jetty Construction

Transhipment

onshore InfrastructureAll samples collected were submitted for XRF and low temperature (150°C) bomb digest analysis; this has enabled Alufer to produce an extensive chemical database and has resulted in a thorough understanding of the available alumina and reactive silica distribution throughout the project

99 representative core samples were selected from all bauxite facies (bauxite – BX, ferruginous bauxite – BXF and lateritic bauxite – BXL) for detailed bauxite characterisation

Analysis included density, moisture, organic carbon, XRF, bomb digest, XRD, minor oxides and trace element analysis

The DSO unwashed Bel Air bauxite should be easily processed as full or partial feedstock in low and high temperature refineries or for sweetening process

Further bauxite characterisation testing revealed three types or bauxite: DSO bauxite; ferruginous bauxite; and lateritic (or clayed) bauxite. Ferruginous and lateritic bauxite can be beneficiated into export products through a process of washing and screening


 
[ 工程承包搜索 ]  [ 加入收藏 ]  [ 告訴好友 ]  [ 打印本文 ]  [ 違規(guī)舉報 ]  [ 關(guān)閉窗口 ]

0相關(guān)評論

聯(lián)系方式

Sorry!

您還未登錄,請先登錄。

環(huán)球工程機(jī)械網(wǎng)? xiaohei